Health Code Cheat Sheet · Monroe County, IL
Monroe County, IL Restaurant Equipment Requirements
These are the Monroe County restaurant requirements for Waterloo, Columbia and Valmeyer. Monroe County plan review, 2026 permit fees and contacts for restaurants in Waterloo, Columbia and Valmeyer.
- Health department
- Monroe County Health Department, Environmental Health (Foods)
- Address
- 1315 Jamie Lane, Waterloo, IL 62298
- Phone
- 618-939-3871, ext. 217
- Food code
- Illinois Food Code
- Covers
- Monroe County, including Waterloo, Columbia and Valmeyer
Start with the federal Food Code equipment checklist and the Illinois Food Code guide. Both apply here. This page covers who you deal with locally and what’s different.
Opening a new establishment
Monroe County publishes a Plan Review Checklist and opening procedures for new food businesses. Call before you buy equipment. Reviewers want:
- A floor plan showing every piece of equipment, hand sink, three-compartment sink, mop sink and floor drain
- Equipment spec sheets showing NSF/ANSI or ETL Sanitation certification
- Your menu, so reviewers can check refrigeration, hot holding and cooling capacity
- Plumbing details: water heater size, indirect drains on ice machines and prep sinks, backflow prevention
- Finish schedule for floors, walls and ceilings
2026 annual permit fees
| Risk category | Annual fee |
|---|---|
| High risk | $309 |
| Medium risk | $206 |
| Low risk | $103 |
Renewals are due by December 31. Late fees start at $100 for the first month and add $50 for each month after that.
Sources

Questions about Monroe County restaurant requirements?
Call the health department listed above before you buy equipment. Getting your list approved first costs nothing and can save you from buying something that won’t pass.
All 18 cheat sheets & city finderFDA Food Code (federal baseline)Illinois Food Code (state baseline)Madison County, ILSt. Clair County, ILEast St. Louis & East Side Health DistrictJersey County, ILClinton County, ILEquipment buying guide
Last reviewed September 2026. This guide is general information to help you plan and ask better questions. It is not legal advice. Codes change and inspectors have final say, so confirm with your health department, building department, fire marshal, and sewer district before you buy or install equipment.